Geotechnical Site Investigation & Report (BC)

ZALIG completed geotechnical site investigation & report for TELUS Communication Towers with heights ranging from 30m to 70m.

The purpose of the site investigation was to address the following scope of work:

On-site drilling of over 5 boreholes to depths ranging from 14 m or auger refusal was performed along with laboratory materials testing which included:

Client:

TELUS Communications

Date:

February 2021

Duration:

2 months

Location:

Edmonton, Alberta

Category:

Geotechnical Engineering

Status:

Completed