- Tank Farm & Rail Spur
- Tank Farm & Rail Spur
- Overview
ZALIG completed a geotechnical site investigation (GSI) for the proposed Tank Farm and Rail Spur.
- Project Goal
The purpose of the site investigation was to address the following:
- General geotechnical characteristics and borehole log of the project site
- Nature and extent of fill and implications for construction
- Groundwater, sloughing conditions, and subsurface drainage requirements
- Recommended foundations types (shallow/deep foundations)
- Basement wall and other design parameters
- Seismic site classification
- Frost design considerations
- Recommendations for Gravel pad for Tank farm and Asphalt parking
- Recommendations for a heavy traffic access route
- Groundwater and sloughing level at the completion of field drilling.
- Identification of utility crossings and any other pertinent information.
- Results
Laboratory testing includes the following:
- Moisture Content ASTM D2216
- Sulphate Analysis ASTM C1580
- Atterberg Limits ASTM 4318
- Project Benefits:
- Fixed cost
- Achieved scope requirements
- The Project was completed ahead of schedule
- Project Details:
Client: | Tank Farm & Rail Spur |
Date: | July 22, 2012 |
Duration: | 1 Month |
Location: | Sturgeon Industrial Park, Fort Saskatchewan, AB |
Category: | Construction Material Testing |
Status: | Completed |