ZALIG completed geotechnical site investigation & report for 7.5 km of road.
Project Goal
The purpose of the site investigation was to address the following:
Ground surface elevation at each borehole location Obtaining soil samples at 0.75 m intervals. Conduct soil shear strength parameters and impact on subgrade performance.
Identification of utility crossings and any other pertinent information for the County.
Results
A total of 32 boreholes was drilled during the drilling program.