In October of 2012 under Stewart Weir (ZALIG Team) completed a geotechnical site investigation & report for a proposed expansion at the 707S St. Paul & 819S Whitby Substations on the behalf of ATCO Electric Ltd.
Project Goal
Determine the subsurface soil profiles and their geotechnical characteristics.
Groundwater and sloughing conditions.
Field and laboratory investigation results for the design and construction of the proposed expansion.
Determine recommendations for frost heave protection and erosion control.
The investigation included drilling three boreholes to 15 m to 20 m below ground surface at 707S St. Paul and one borehole to 20 m at 819S Whitby Substation.
The substations were live energized stations that required the supervision of a qualified ATCO Electric Ltd. safety representative in order to monitor safe limits of approach.